Home
Resources
News
20/11/2018
min read

Another Soyuz success: Arianespace launches Metop-C for Europe’s meteorological operational system

Europe's latest Earth-observation satellite blasted off into orbit today (Nov. 6) on a mission to improve weather forecasts and monitor changing cl...

Another Soyuz success: Arianespace launches Metop-C for Europe’s meteorological operational system
Table of Contents
Download the PDF

Europe's latest Earth-observation satellite blasted off into orbit today (Nov. 6) on a mission to improve weather forecasts and monitor changing climates around the globe. <span lang="EN-US" style="background: white; margin: 0px;"><font face="Arial" size="3">Metop-C is the third and final satellite of its Polar System (EPS), the Metop program dedicated to operational meteorology.</font></span></p> <p style="text-align: justify;"><img alt="" data-cke-saved-src="/sites/default/files/3_1.jpg" src="/sites/default/files/3_1.jpg" style="width: 357px; height: 505px;" /></p> <p style="text-align: justify;"> </p> <p style="margin: 0px 0px 13.33px; text-align: justify;"><span lang="EN-US" style="background: white; margin: 0px;"><font face="Arial" size="3">It was the eighth launch of the year, and the second Soyuz liftoff from the Guiana Space Center (CSG) in French Guiana in 2018.</font></span></p> <p style="text-align: justify;"> </p> <p style="margin: 0px 0px 13.33px; text-align: justify;"> </p> <p style="margin: 0px 0px 13.33px; text-align: justify;"><strong><i><span lang="EN-US" style="margin: 0px; color: rgb(33, 40, 45); font-family: "Arial",sans-serif;"><font size="3">ABOUT GTD AT KOUROU SPACE CENTER</font></span></i></strong></p> <p style="margin: 0px 0px 13.33px; text-align: justify;"><span lang="EN-US" style="margin: 0px;"><font face="Arial" size="3">Since 2003, each time an Ariane 5, a Soyuz or a VEGA are launched from the spaceport in Guiana, as well as the payload, many hours of work are required from GTD’s technical teams.</font></span></p> <p style="margin: 0px 0px 13.33px; text-align: justify;"><span lang="EN-US" style="margin: 0px;"><font face="Arial" size="3">GTD supplies services and software in practically all steps of an Ariane 5 mission – from the launcher's flight program to the responsibility of ground systems that control the launching operations, as well as the radars, telemetry and mission control systems.</font></span></p> <p style="margin: 0px 0px 13.33px; text-align: justify;"><span lang="EN-US" style="margin: 0px;"><font face="Arial" size="3">Each launch is also a challenge for GTD’s team, who is responsible for all the computer systems at the launch site. Each launch is a fresh new project; there is no routine, which means our engineers always embark on an adventure than goes beyond technical jobs that require a lot of responsibility.</font></span></p> <p style="margin: 0px 0px 13.33px; text-align: justify;"><span lang="EN-US" style="margin: 0px;"><font face="Arial" size="3">Countdown:  The campaign to prepare a launcher takes about 22 - 30 working days, and a campaign to prepare the payload (satellite) takes from 4 weeks to 5 months (depending on the mission and its magnitude). Our teams are currently able to launch up to seven double Ariane 5, up to four soyuz and up to two Vega per year, that is, 14 telecom satellites and 4 to 6 EO and scientific spacecraft every year.</font></span></p> <p style="margin: 0px 0px 13.33px; text-align: justify;"><span lang="EN-US" style="margin: 0px;"><font face="Arial" size="3">Launch day:  The end of the countdown is near. The final operations to fill the liquid propellants on the Ariane 5, and then the ground operation tests are carried out on the launcher. During this stage, gtd's staff is working hard all round the Spaceport. In the launch site's bunker, the technical centre, in Des Pêres Mountain where the radar and telemetry installations are, in the meteorological centre where the last conditions before the launch is authorised.</font></span></p> <p style="margin: 0px 0px 13.33px; text-align: justify;"><span lang="EN-US" style="margin: 0px;"><font face="Arial" size="3">At the same time, a support team is configuring a backup of the computer systems in Barcelona, 8,000 km away from the Ariane 5, which is already letting out oxygen steam.</font></span></p> <p style="margin: 0px 0px 13.33px; text-align: justify;"><span lang="EN-US" style="margin: 0px;"><font face="Arial" size="3">Ariane is launched:  Once the launcher is in the air, it is controlled on board (by the embedded computer) and from the Jupiter Control Centre (CDC). These two systems were also designed by GTD’s engineers and are currently being operated by GTD’s engineers, too. Once the launcher releases the payloads (at a height of 500 - 600 km), everyone breathes a sigh of relief and starts clapping and cheering and congratulating each other; but our engineers are already thinking about the next mission that starts the following morning.</font></span></p> <p> </p> Metop-C is the third and final satellite of its Polar System (EPS), the Metop program dedicated to operational meteorology. It was the eighth launch of the year, and the second Soyuz liftoff from the Guiana Space Center (CSG) in French Guiana in 2018. ABOUT GTD AT KOUROU SPACE CENTER Since 2003, each time an Ariane 5, a Soyuz or a VEGA are launched from the spaceport in Guiana, as well as the payload, many hours of work are required from GTD’s technical teams. GTD supplies services and software in practically all steps of an Ariane 5 mission – from the launcher's flight program to the responsibility of ground systems that control the launching operations, as well as the radars, telemetry and mission control systems. Each launch is also a challenge for GTD’s team, who is responsible for all the computer systems at the launch site. Each launch is a fresh new project; there is no routine, which means our engineers always embark on an adventure than goes beyond technical jobs that require a lot of responsibility. Countdown: The campaign to prepare a launcher takes about 22 - 30 working days, and a campaign to prepare the payload (satellite) takes from 4 weeks to 5 months (depending on the mission and its magnitude). Our teams are currently able to launch up to seven double Ariane 5, up to four soyuz and up to two Vega per year, that is, 14 telecom satellites and 4 to 6 EO and scientific spacecraft every year. Launch day: The end of the countdown is near. The final operations to fill the liquid propellants on the Ariane 5, and then the ground operation tests are carried out on the launcher. During this stage, gtd's staff is working hard all round the Spaceport. In the launch site's bunker, the technical centre, in Des Pêres Mountain where the radar and telemetry installations are, in the meteorological centre where the last conditions before the launch is authorised. At the same time, a support team is configuring a backup of the computer systems in Barcelona, 8,000 km away from the Ariane 5, which is already letting out oxygen steam. Ariane is launched: Once the launcher is in the air, it is controlled on board (by the embedded computer) and from the Jupiter Control Centre (CDC). These two systems were also designed by GTD’s engineers and are currently being operated by GTD’s engineers, too. Once the launcher releases the payloads (at a height of 500 - 600 km), everyone breathes a sigh of relief and starts clapping and cheering and congratulating each other; but our engineers are already thinking about the next mission that starts the following morning.

News and Events

See All
No items found.

News and Events

See All
Partner with Experts in Mission-Critical Systems

From design to operation, we deliver high-performance solutions tailored to the most complex challenges. Let’s build the future together.

Contact