GTD has commissioned the new configuration process of the launchers’ tracking (radar and telemetry) systems for operational use. Unlike Ariane 5, S...
Thales has presented at Le Bourget “Avionics 2020”, the new generation of cabin’s cockpits introducing man-machine interfaces designed to facilitat...
GTD has sponsored the symposium Ground-Based Space Facilities that was celebrated in Paris the last 12th 13th and 14th June 2013. The is the fir...
A consortia leadered by Telespazio VEGA Deutschland, together with GTD, CGI and Dutch Space will support harmonisation of European Space Mission In...
Certainly the major responsibility of the CNES in the European Space Port is related to safety requirements for people and goods during launching c...
GTD has recently finalised a new step into the development and final certification of the Mission Management System (M-MMS) that is software-develo...
With global energy demand set to double by 2050 concern about climate change, carbon emissions and security of supply is driving new pressures in t...
Ariane 5 getting out from the BAF building Large infrastructures with numerous buildings spread over large areas are needed to launch Ariane5 rocke...
Following an international competition, bringing together the best European Engineering’s, Fusion for Energy ‘F4E’, the Entity representing Europe ...
500Engineers
Clients in 26 Countries
6 Offices Worldwide
90 M€ Total Revenue
From design to operation, we deliver high-performance solutions tailored to the most complex challenges. Let’s build the future together.