GTD’s Launch Control System ensured safe countdown and flight termination for Isar Aerospace’s Spectrum test—the first commercial orbital launch attempt in Europe.
GTD has sponsored the Hypatia II mission, an analog Mars mission conducted in February 2025 at the Mars Desert Research Station (MDRS) in Utah, USA.
On March 6, 2025, Ariane 6’s first commercial mission deployed the CSO-3 satellite—powered by GTD’s mission-critical software and on-site expertise for flawless launch.
GTD leads deployment of ice storage at Guiana Space Centre, cutting cooling energy use by 22% and slashing CO₂ emissions via off-peak renewable power.
Ariane 6’s maiden flight from French Guiana deployed satellites—powered by GTD’s mission-critical software as Europe ramps up to 14 launches/year.
GTD wins ESO contract to deliver a fully automated monitor & control system for the 3.6 m Coating Plant at La Silla Observatory—boosting telescope performance and efficiency.
Introducing GTD’s patented “Cold Storage” energy system—an AI-driven solution that captures low-cost renewable power for efficient, sustainable energy management at CSG’s new Ariane 6 launchpad.
The GAIA project, in which GTD Defensa y Seguridad participates, has been selected as a beneficiary of the TransMisiones 2023 initiative. The initi...
500 Engineers
Clients in 26 Countries
6 Offices Worldwide
90 M€ Total Revenue